Aller au contenu principal Activer le contraste adaptéDésactiver le contraste adapté
Plus de 40 000 produits accessibles à 0€ de frais de courtage
Découvrir Boursomarkets
Fermer
Forum IBERDROLA
11.4350 (c) EUR
-0.65% 
Ouverture théorique 11.5800
indice de référenceEURO STOXX 50

ES0144580Y14 IBE

Sibe données temps différé
Chargement...
  • ouverture

    11.5800

  • clôture veille

    11.5100

  • + haut

    11.5850

  • + bas

    11.3200

  • volume

    8 962 079

  • capital échangé

    0.14%

  • valorisation

    73 450 MEUR

  • dernier échange

    25.04.24 / 17:29:59

  • limite à la baisse

    Qu'est-ce qu'une limite à la hausse/baisse ?

    Fermer

    0.0000

  • limite à la hausse

    Qu'est-ce qu'une limite à la hausse/baisse ?

    Fermer

    0.0000

  • rendement estimé 2024

    5.06%

  • PER estimé 2024

    Qu'est-ce que le PER ?

    Fermer

    14.39

  • dernier dividende

    A quoi correspond le montant du dernier dividende versé ?

    Fermer

    0.41 EUR

  • date dernier dividende

    09.01.24

  • Éligibilité

    -

  • Risque ESG

    Qu'est-ce que le risque ESG ?

    Fermer

    17.2/100 (faible)

  • + Portefeuille

  • + Liste

Retour au sujet IBERDROLA S.A

IBERDROLA : Perspectives 2013 :

02 févr. 2013 17:44

Projects for 2013

During the event, Galán also discussed projects to be carried out in 2013. In Spain, highlights here included the completion of the new 800 MW La Muela hydroelectric pumping station with 800 MW in Valencia and the beginning of the expansion of the San Pedro plant in Orense.

In the UK, the Chairman singled out construction of the first subsea line between Scotland and England spanning a total of 420 kilometers, the 136 MW Harestanes wind farm and the 400 MW West of Duddon Sands offshore wind farm, the biggest project ever of this type by the Group. Elsewhere, he noted the planned construction start for ScottishPower’s new headquarters in Glasgow.

In the US, the Company will continue work on the 800 km high-voltage power line in Maine, of which more than 50% has already been completed.

For Brazil, Ignacio Galán highlighted ElektroŽs integration in the Group, which will maximize synergies and improve efficiency. The main projects in this country include the construction of large hydroelectric facilities, such as the 1,820 MW Teles Pires plant and the 350 MW Baixo Iguaçu plant, as well as wind farms.

Galán also highlighted IBERDROLAŽs commitment to its employees and the environment, which are in line with the values ​​of transparency, ethics, innovation and respect for the environment that shape the Company. In this respect, he stressed a focus on innovative projects which has led the Company to head the European Commission’s R+D+i ranking for European utilities.

IBERDROLA also achieved the highest score of the Dow Jones Sustainability Index and has become the leading company in its sector, with a level of emissions 30% lower than the average for European utilities and more than half of its output emission-free.

In addition, IBERDROLA will maintain the social policies which have been in place for years now, employing advanced work-life balance and committing to ensure its workforce continues to receive the best training.

As part of the its commitment to society, 800 young people have had the opportunity to receive practical training at the company through scholarships and apprenticeships and more than 100 have completed postgraduate studies at British, Spanish and American universities sponsored by the IBERDROLA Foundation.

0 réponse

Signaler le message

Fermer

Qui a recommandé ce message ?

Fermer
Retour au sujet IBERDROLA S.A

Mes listes

Cette liste ne contient aucune valeur.